Example of a Triple Section 32' x 72' Home
WIND ZONE I for Triple Section Homes
Using Vector Dynamics Foundation Systems
Soil Classifications: 2, 3, 4A & 4B
Soil Bearing Capacity: 1,000 PSF Minimum
Anchors Required*: None(*Marriagewall and sheer wall anchors may be required by home manufacturer.)
Home Length Vector Systems Anchors Required Longitudinal
Required Per Side System
1
(LSD)
0 to 48' 2 + 2 on Tag 0* 2(4Struts)
49' to 71' 3 + 2 on Tag 0* 2(4Struts)
72' to 84' 4 + 2 on Tag 0* 2(4Struts)
85' to 90' 5 + 2 on Tag 0* 2(4Struts)
NOTES:
*When a pier height at Vectorlocationsexceeds46”, an anchor must be used on the outside wall/beam at
thatapproximatelocation.Vector Systems should be spaced as symmetrical as possible along the length of
the home. Pier spacing must be consistent with home manufacturers instruction and/or state requirements.
Maximumallowable working load for metal strut: 3150 lbs.
1
One Longitudinal Vector System is made up of 2 struts, which can be used separately.
Vector Systems
LSD
LSD LSD
LSD
Tag or Full Triple
16 Revised: 8/19/08