Page 9 4/3/2013
Set-Up Instructions for
Vector System #59018
1. Set Vector Pads
Clear all vegetation where pads will rest. Place a long
U-boltinpadasshown.Pressorhammerpadintothe
ground.
2. Set Block or piers on pads.
Center foundation blocks or piers on pads. Place
pre-cut center compression member between blocks,
restingonpads,centersbetweenU-boltsasshown.
3. Outside Tension Bracket
Attachoutsidetensionbracketasshowntooutside
of pads.
4. Inside brackets & straps
AttachtheinsidetiebracketstotheU-boltsoverthe
compressionmember.Attachastrapw/hookorswivel
strap w/nut & bolt. Place other end of the strap over
opposite I-beam & down to outside tension bracket.
Cutstrap12-15inchespastbracket.Attachstrap
& slotted bolt in bracket. Tighten strap until tight with
4-5wrapsaroundbolt.Repeatwithoppositestrap.