Page18 4/3/2013
Asphalt Installation
TheseAsphaltinstructionsareanaddendumtothestandardVectorDynamicsconcreteinstructions.Readand
follow all applicable guidelines in the instructions for Vector, the home, office, classroom or portable building
being installed. Minimum depth of asphalt is 2 inches with a suitable base material compacted under the
asphalt. This system is designed for portable classrooms, offices or other structures using I-beam frames.
NOTE-ForMultipleunitsets,alwaysinstallbyunitastheyareplaced.
1. TheasphaltkitisusedincombinationwiththeVectorconcretekits59036and59049.Theexpansionbolts
providedinthesekitsarenotused.Assembletheasphaltbracketasshowningure1,usingthecarriage
boltsandhexnutsprovided.Theboltheadswillbeontheunderside(at)oftheVectorpad.TheAsphalt
bracketwillbepositionedbetweentheVectorpadandthetensionbracket.Repeatforthesecondpad.
2. Determine the location of the piers and place assembled pad on asphalt. Center pad under beam with
upturned edge facing the Inside. Place second pad under opposite beam, parallel with first pad. Stack
concrete blocks against up turned lip on pads and finish and wedge pier.
3. Usingtheasphaltbracketsasaguide,drillthree5/8”holesintheasphaltata45degreeangleunderpier.
Usingasledgehammerorhammerdrill,driverodssuppliedthroughthebracketandintotheasphalt,
leavingoneinchofrodabovebracket.Repeatforoppositepad(seegure2).
4. Measure distance between the two Vector System pads at the base where the Vector pad meets the asphalt.
Cuttwogroundtreated2x4’sora4x4tolengthandplacebetweenpiersasshown.PlacealongU-bolt
underthe2x4’sandthroughtheholesintheupturnededgeoftheVectorPad.Beforesecuringwiththe3/8”
nutsprovided,placea1/2”x1”carriageboltprovidedinthesquareholeintheupturnededgeoftheVector
pad. The carriage bolt will be installed with the head of the bolt under the upturned edge with the
threads showing.
5.Attachastrapwithswivelstrapconnectortothe1/2”carriagebolt.Securewith1/2”nut.Strapshouldbe
ofsufcientlengthtogoovertheoppositeI-beamanddowntothetensionbracketwith12”-15”extrato
wrap around the slotted bolt. (See figure 2).
6.Insertslottedboltintensionbracket,andcutstrapsothereisapprox.12”-15”ofstrapoverlap.Insertinslot
ontheboltsothatitisushwithothersideofbolt.Tightenstrapontoboltsothereare4-5turnsofstrap
around the bolt and repeat for other side.
Figure 1
Figure 2